ASK WHAT YOU WANT TO KNOW
Frequent Asked Questions

Do you offer discounts for multiple inspections?
Yes, we certainly do! We have bundle deals for multiple inspections that save you several hundreds of dollars. Please contact us for a free quote tailored to your requirements.
What stages should we inspect?
Correct Inspections recommends you inspect all 5 main stages, to ensure peace of mind throughout your build. Each stage is very important for different reasons. The main inspection stages are;
* Pre-Slab Pour (prior to pouring concrete slab)
* Frame Stage
* Pre-Plaster (after insulation, but before installing plaster)
* Fixing & Waterproofing (before painting and tiling)
* Handover
* Pre-Slab Pour (prior to pouring concrete slab)
* Frame Stage
* Pre-Plaster (after insulation, but before installing plaster)
* Fixing & Waterproofing (before painting and tiling)
* Handover
Are you registered with the Victorian Building Authority?
Yes, we most certainly are! Although there is no specific requirement for your building consultant to be registered with the VBA, wouldn’t you want to ensure that the building inspector you choose for your project is qualified and experienced?
How long will the report take?
While other companies can take days to prepare and send the report, we always complete our detailed reports same day, within hours of the inspection.
What documents do you require for the inspections?
n order to provide you with the best possible service, we require a PDF copy of the following documents;
* Building plans
* Engineering plans (including all frame engineering)
* Building Permit
* All of these documents can be obtained directly from your builder.
* Building plans
* Engineering plans (including all frame engineering)
* Building Permit
* All of these documents can be obtained directly from your builder.